Example website · made-up business · built by iGetResultsWant one like this? →
Setout TilingPerth northern suburbs Get a free quote
S-01Bathroom and feature tiling · Perth

Lines that line up.

Floor-to-ceiling bathrooms, feature walls and splashbacks across Perth’s northern suburbs, set out properly with a laser before the first tile goes on.

  • 4.9 from 158 Google reviews
  • Laser set-out on every job
  • Waterproofing certified, fully insured
Marble-look tiled shower with frameless glass beside a green double vanity with brass tapware
Floor-to-ceiling shower and vanity wallCuts hidden, lines true
S-02What we tile

Four jobs, done the long way.

Two people, one laser, no shortcuts. Every job is measured, planned on paper and set out on the wall before we mix any adhesive.

Walk-in shower tiled in large marble-look porcelain with a long wall niche and linear drain

Bathrooms

Strip-out, waterproofing and tiling, floor to ceiling. The niche lines up with the grout. Always.

What’s included
  • Strip-out and removal of old tiles
  • Screeding falls to the waste
  • Certified waterproofing and a flood test
  • Wall and floor tiling, grout and silicone
  • Niches, hobless showers and linear drains
Glossy green zellige tiles laid in a herringbone pattern

Feature walls

Zellige, fish scale, fluted and mosaic. The fiddly ones other tilers quote high to avoid.

What’s included
  • Pattern set-out drawn up before we start
  • Handmade and irregular tiles sorted for colour
  • Mitred or trimmed edges, your call
Terrazzo floor tiles with grey, green and terracotta chips

Kitchens and laundries

Splashbacks and floors with clean cuts around every power point, tap and cabinet end.

What’s included
  • Splashbacks up to rangehoods and windows
  • Laundry floors and wet walls, waterproofed
  • Cut-outs planned with your electrician
Large-format marble-look porcelain floor through an open-plan living and dining room

Floors

Large-format porcelain laid dead flat with levelling clips, so no tile edge catches a toe.

What’s included
  • Floor checked for flatness before we start
  • Levelling clips on every large-format tile
  • Expansion joints where the room needs them
T2Pattern picker

Same tile. Different lay.

The pattern changes how a room feels, how many tiles you buy and how long the job takes. Tap one to see it.

Square green tiles laid in a stack bond grid
Stack bondallow ~10% extra

Stack bond

Typical wastage
Best for
Set-out effort
Kai’s tip
S-03Free tools

Do the maths before you ring.

Handy for tile shopping, budgeting or just working out if that damp patch is a problem. Figures are typical and approximate. Every one ends with the option to send your numbers to Kai.

T1

Tile calculator

How many square metres, boxes and adhesive bags for your room, with a wastage allowance that suits your pattern.

What are we tiling?
Used for full-height walls.
A standard door is about 1.7 m².
Printed on the box or the tile shop’s website. We fill in a common size.
Order about
0m² of tile
Floor
0 m²
Walls (less openings)
0 m²
Wastage allowance
0%
Tiles, approx
0
Boxes
0
Adhesive, 20 kg bags
0

Assumes a simple rectangular room. Wastage is a typical allowance for cuts and breakages: about 10% for straight lays, 15% or more for herringbone and chevron. Adhesive assumes roughly 4 m² per 20 kg bag (typically 3 to 5 m² depending on tile size and trowel). Buy every box from the same batch so the shade matches. Showers and niches add a little more.

T3

Shower leak checker

Tick what you can see. It won’t replace an inspection, but it will tell you whether to keep an eye on it or get it looked at.

Our read
Looks fine so far

Tick anything you’ve noticed and we’ll tell you what it usually means.

A guide only, based on the common signs of a failed shower membrane. Cracked grout and silicone alone can often be fixed with a regrout and reseal. Stains or swelling beyond the shower usually mean water has got past the waterproofing. If water is coming through a ceiling, stop using the shower and get it checked.

G1

Waterproofing, explained

The part of a bathroom you never see and the part that matters most. Here’s what happens under your tiles, step by step.

    Official sources: National Construction Code (ABCB) · Standards Australia (AS 3740) · WA Building and Energy

    S-04Recent jobs

    Look at the edges.

    Anyone can tile the middle of a wall. Check the corners, the niches and the last row by the ceiling. That’s where set-out shows.

    Floor-to-ceiling ensuiteScarborough
    Terrazzo laundryDoubleview
    Zellige splashbackMount Hawthorn
    Hexagon tile and brushed brassInnaloo
    Large-format floorChurchlands
    4.9
    ★★★★★
    158 Google reviews
    Sample reviews
    The grout lines are perfect, even around the niche. You can tell they planned every cut.
    Hannah R. · Ensuite, Scarborough
    Quoted fast, started on time and finished a day early. The terrazzo looks incredible.
    Josh K. · Laundry, Doubleview
    They talked us out of a layout that would have left skinny cuts at the door. So glad we listened.
    Leah F. · Splashback, Mount Hawthorn
    Maddie sorted every zellige tile by shade before a single one went up. The wall looks like it was always meant to be there.
    Priya S. · Feature wall, Innaloo
    Our old shower leaked into the hallway for years. Kai showed us the flood test before tiling. Bone dry since.
    Mark and Jen T. · Bathroom, Trigg
    Big 1200 tiles through the whole living area and not one lip. Our robot vacuum approves.
    Daniel W. · Floor, Churchlands
    S-05How it works

    From photo to final wipe.

    No surprises halfway through. You know what’s happening each day and who’s doing it.

    1. Send photos

      A few photos and rough measurements. We get back to you within a day.

    2. We measure

      Kai visits, checks the walls and floor, and talks tiles, patterns and layout.

    3. Set-out plan

      We show you where every cut will land before you sign off, with a written quote.

    4. Waterproof

      Strip-out, falls, certified membrane and a flood test before any tile goes on.

    5. Tile and hand over

      Tiling, grout and silicone, a proper clean and your waterproofing certificate.

    A tiler’s hand guiding a stone tile through a wet saw, in black and white
    S-06About us

    We set out before we stick down.

    Every Setout job starts with a laser and a plan, so the cuts land where nobody sees them and the lines run straight to the ceiling.

    We’re a two-person crew, so the person who quotes your job is the person who tiles it. No subcontractors turning up on day three.

    • Laser set-out on every job
    • Waterproofing certified, fully insured
    • On site Mon to Fri, 6:30am to 3:30pm

    Kai and Maddie, Setout Tiling

    S-07FAQ

    Things people ask us.

    Can’t see yours? Send it through with your photos and we’ll answer it.

    How long will my bathroom take?

    A typical full bathroom, from strip-out to final clean, usually takes around two to three weeks. Waterproofing needs curing time between coats, which is most of the waiting. Your quote comes with a day-by-day plan.

    Do you supply the tiles, or do I?

    Either works. Pick your own, or tell us the look and we’ll suggest tiles that suit the room and the budget. Use the tile calculator above to see roughly how much to buy.

    Why do herringbone and chevron need more tiles?

    Every edge of the room gets angled cuts, and more offcuts end up too small to reuse. A typical allowance is about 15% or more, compared with about 10% for straight lays.

    What does “laser set-out” actually mean?

    Before tiling, we project level and plumb lines onto the walls and floor, then plan the layout so cuts are even on both sides and full tiles sit where your eye goes first: the niche, the vanity, the doorway.

    Can you tile over my old tiles?

    Sometimes, on a sound floor outside the wet area. We won’t do it in a shower, because the waterproofing underneath needs replacing too. We’ll check and tell you straight.

    Will I get a waterproofing certificate?

    Yes. It’s handed over at the end with your invoice. Keep it with your house papers, as buyers and insurers can ask for it.

    Can we still use the bathroom during the job?

    Not the one we’re working on. If it’s your only bathroom, tell us early and we’ll plan the job to keep the no-shower days as short as possible.

    My grout is cracked. Do I need a whole new bathroom?

    Not always. Try the leak checker above. Cracked grout on its own is often fixed with a regrout and fresh silicone. Swelling timber or stains next door usually mean the membrane has failed.

    S-08Free quote

    Get a free quote.

    Send a few photos and rough measurements and we’ll get back to you within a day.

    Phone
    0400 XXX 000
    Hours
    Mon to Fri, 6:30am to 3:30pm
    Area
    Perth northern suburbs
    Cover
    Waterproofing certified, fully insured

    Where we work

    • Perth northern suburbs
    • Scarborough
    • Doubleview
    • Mount Hawthorn
    • Innaloo
    • Churchlands
    • Trigg

    We’ll ask for photos when we reply.

    Text Setout Tiling

    To: Kai, Setout Tiling (0400 XXX 000)
    📱 On your real website, this sends straight to your phone.